January 20, 2021
CRP Subsea (formerly Trelleborg Offshore UK) awarded contract by Torgy LNG AS to provide NjordGuard cable protection for Jiangsu Qidong offshore wind project in China
CRP Subsea (formerly Trelleborg Offshore UK) has been awarded a contract by Torgy LNG AS to provide 190 integrated cable protection systems for Jiangsu Qidong offshore wind farm project, located in Jiangsu, China. CRP Subsea’s NjordGuard cable protection system will protect inter-array grid power cables on the project from over-bending, abrasion, and fatigue.
Ralph Wu, Sales Manager for renewables at CRP Subsea’s operation in China, states: “We are proud to be selected to provide CRP Subsea’s NjordGuard cable protection system for Jiangsu Qidong, one of China’s biggest offshore wind projects. It’s fantastic to support this prestigious project.”
Alexander Aguilera, CEO at Torgy LNG AS, states: “We are very proud to be working on the Jiangsu Qidong offshore wind farm project and as we always strive to deliver at the highest quality and safety standards. CRP Subsea’s NjordGuard cable protection suited us very well for this purpose, providing our state-of-the-art technology in the growing renewables sector in China.”
NjordGuard is an integrated cable protection system designed and developed to protect offshore windfarm power cables in wind turbine generators and offshore substations. Easily assembled on a cable lay vessel to allow speedy installation, the system is manufactured in highly abrasion resistant and API 17L certified Uraduct® material, which enables the protection system to travel over the seabed without damage, extending the system life. Most importantly, it facilitates easier installation, reuse, and removal without diver and ROV intervention, optimising efficiency and maximising safety.